    Request for Information (RFI)

    A formal construction question used to resolve unclear, conflicting, or missing contract-document information.

    What is Request for Information (RFI)?

    A request for information, or RFI, is the formal process for asking the design team or general contractor to clarify the contract documents. Low-voltage RFIs commonly address conflicting device counts, missing riser information, unclear cable types, door-hardware responsibilities, unavailable equipment-room space, absent power, or differences between drawings and specifications. A useful RFI is specific and neutral. It cites the exact drawing, detail, specification section, or addendum; explains the conflict; states the schedule or cost impact when known; and asks one answerable question. Marked-up exhibits help reviewers understand the issue quickly. Contractors should not use an RFI to quietly rewrite scope or proceed on an undocumented assumption. Responses should be distributed to affected trades, reflected in estimates and submittals, and incorporated into record documents when they change the work.

    Frequently asked questions

    Not by itself. An RFI clarifies information; contract changes and added cost normally require the project’s formal change-order process.

    Submit one when the documents are unclear, conflicting, or missing information that is needed to price or install the work.

    Not by itself. If the answer changes scope, the change is handled through the project's change order process.