Rough-In
The construction phase where low-voltage boxes, conduit, and cable are installed before walls are closed.
What is Rough-In?
Rough-in is the phase where the low-voltage contractor installs everything that will be hidden: back boxes, mud rings, conduit stubs, J-hooks, sleeves, and the cable itself, pulled and coiled at each location. It happens after framing and before drywall, and it is unforgiving — anything missed at rough-in either becomes a surface-mounted compromise or a costly wall cut later. Rough-in is typically sequenced behind the electrician and ahead of insulation, and on multifamily projects it runs building by building rather than trade by trade. Progress at rough-in is what drives the bulk of early pay application billing on a low-voltage contract.
Frequently asked questions
Published references
Use the current project documents and adopted code. These links identify the standards owner, regulator, or manufacturer behind this article.
Where EIG PRO uses this
Related terms
Cat6 / Cat6A Cable
Twisted-pair copper cabling rated for gigabit (Cat6) or 10-gigabit (Cat6A) Ethernet.
J-Hook / Cable Pathway
A J-shaped support that holds horizontal cable runs above a drop ceiling.
Structured Cabling
The standardized cabling infrastructure (Cat6/6A, fiber) that supports networking, voice, video, and low-voltage devices.
Trim-Out
The finish phase where jacks, devices, cameras, readers, and panels are terminated, tested, and labeled.